Home
#007144F

Raypak Genuine OEM Hi-Limit W/Long Lead-Manual Reset

Raypak 007144F

Write a Review Ask a question
$239.99
In Stock
Rewards
Earn 239 points
Add product protection offered by
Quick Overview

Raypak High Limit Manual Reset Kit, Temperature Rating: 100 to 240 deg F, Fits Model 992, 1262, 1532, 1802, 2002, 2072, 2342 Commercial Pool Heater

Questions? Contact our pool professionals:

Specs & Details

Product NameGenuine OEM Hi-Limit W/Long Lead-Manual Reset
Manufacturer Part Number007144F
SkuRAY-151-1330
UPC840891005995
Manufacturer
Raypak
Raypak
75%% of 100
Raypak’s design goals are and have always been high quality, reliability and energy efficiency. Adhering to these basics is the reason the reputation ... Show MoreRaypak’s design goals are and have always been high quality, reliability and energy efficiency. Adhering to these basics is the reason the reputation of the company is held in such high regard by design build consultants, specifying engineers, distributors, contractors and homeowners. In 1996, Raypak was registered to ISO 9001, becoming the first boiler manufacturer to achieve the highest registration level attainable. Show Less
Downloads
Questions & Reviews
0 reviews
Reviews
Be the first to write a review
Questions
Be the first to ask a question

California Proposition 65 Warning

WARNING: This product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm. For more information: www.p65Warnings.ca.gov